GEYA GRT8-S1

GEYA Asymmetric Cycle Time Relay GRT8-S1 Instruction Manual

Model: GRT8-S1 (AC/DC12V-240V)

Marca: GEYA

1. Introducció

The GEYA GRT8-S1 is an asymmetric cycle time relay designed for various industrial and home automation applications. It offers two primary time functions: cycler beginning with a pulse (ON first) and cycler beginning with a pause (OFF first). This relay features a wide time scale from 0.1 seconds to 100 days, divided into 10 time ranges, and is equipped with an LED indicator for relay status. Its ultra-small size allows for convenient 35mm DIN rail mounting.

This manual provides detailed instructions for the safe installation, configuration, and operation of your GRT8-S1 relay.

GEYA GRT8-S1 Asymmetric Cycle Time Relay front view

Figure 1: GEYA GRT8-S1 Asymmetric Cycle Time Relay

2. Informació de seguretat

  • Always disconnect power before installation, wiring, or maintenance to prevent electric shock.
  • La instal·lació ha de ser realitzada per personal qualificat d'acord amb els codis i les normatives elèctriques locals.
  • Assegureu-vos del volum del relétage and current ratings match your application requirements.
  • No exposeu el dispositiu a la humitat, temperatures extremes ni ambients corrosius.
  • Comproveu que totes les connexions estiguin segures abans d'aplicar energia.

3. Producte acabatview

The GRT8-S1 features clearly labeled terminals and adjustment potentiometers for easy configuration. The front panel includes LED indicators for power supply and output status.

Detallada view of GEYA GRT8-S1 relay showing function selection, supply terminals, LED indicators, and time adjustment knobs

Figure 2: GRT8-S1 Component Layout and Indicators

Components clau:

  • Supply Terminals (A1, A2): Per connectar la font d'alimentació.
  • Function Selection (S-A1 Jumper): Determines the starting state of the cycle.
  • Indicació LED: Green LED for power supply (Un), Red LED for output (R).
  • T1 ON Time Adjustable Potentiometer: Sets the duration of the ON state.
  • T2 OFF Time Adjustable Potentiometer: Sets the duration of the OFF state.
  • Output Terminals (15, 16, 18): Single Pole Double Throw (SPDT) contacts for controlling the load.

4. Configuració

4.1 Muntatge

The GRT8-S1 is designed for 35mm DIN rail mounting. Simply clip the relay onto the DIN rail in your electrical enclosure. Ensure it is securely fastened.

4.2 Esquema de cablejat

Connect the power supply and load according to the wiring diagrams below. The GRT8-S1 is a 1SPDT (Single Pole Double Throw) relay, meaning it has one common terminal (15), one normally closed (NC) terminal (16), and one normally open (NO) terminal (18).

Wiring diagram for GRT8-S1 and GRT8-S2 relays, showing connections for A1, S, A2, 15, 16, 18 terminals

Figure 3: GRT8-S1 Wiring Diagram

Example Wiring for a Load:

Wiring diagram showing a GEYA GRT8-S1 relay connected to a bulb, illustrating a cyclic operation

Figura 4: Example Wiring with a Bulb

En aquest example, the bulb works for a period (T1), stops for a period (T2), and continues to cycle until the relay is powered off.

4.3 Selecció de la funció

The GRT8-S1 offers two operating modes, selected by an external jumper between terminals S and A1:

  • Cycler beginning with pulse (ON first): No jumper between S and A1. The load turns ON for T1, then OFF for T2.
  • Cycler beginning with pause (OFF first): Jumper connected between S and A1. The load turns OFF for T1, then ON for T2.
GEYA GRT8-S1 relay with timing diagrams illustrating 'Cycler beginning with pulse' and 'Cycler beginning with pause' functions

Figure 5: Function Selection and Timing Diagrams

4.4 Configuració de l'hora

The relay has two potentiometers for setting the ON time (T1) and OFF time (T2), each with a time range selector and a percentage knob. The time scale ranges from 0.1 seconds to 100 days.

Diagram showing how to set time on the GEYA GRT8-S1 relay using the time range and percentage knobs for T1 and T2

Figure 6: How to Set Time (T1 and T2)

To set a specific time:

  1. Select Time Range: Use the upper knob (1 or 3) to select the desired time range (e.g., 1s-10s, 1min-10min, 1h-10h, 1d-10d).
  2. Adjust Percentage: Use the lower knob (2 or 4) to set the percentage within the selected time range. For example, if the range is 10 minutes and the percentage is 50%, the time will be 5 minutes.
Example calculation for setting delay time on the GEYA GRT8-S1 relay, showing time knob multiplied by percentage perilla

Figure 7: Time Setting Example Càlcul

5. Funcionament

Once wired and configured, apply power to terminals A1 and A2. The green LED (Un) will illuminate, indicating the power supply is active. The red LED (R) indicates the status of the output relay.

  • Cycler beginning with pulse (No S-A1 jumper): The red LED will turn ON for the set T1 duration, then turn OFF for the set T2 duration. This cycle repeats as long as power is supplied.
  • Cycler beginning with pause (S-A1 jumper): The red LED will remain OFF for the set T1 duration, then turn ON for the set T2 duration. This cycle repeats as long as power is supplied.

Video 1: GEYA GRT8-S1 Product Overview and Operation Demonstration

6. Manteniment

The GEYA GRT8-S1 is designed for reliable, long-term operation with minimal maintenance. Periodically inspect the relay and its connections for any signs of damage, loose wiring, or overheating. Ensure the environment remains within the specified operating temperature and humidity ranges. No user-serviceable parts are inside the unit.

7. Solució De Problemes

  • El relé no s'activa: Check the power supply to terminals A1 and A2. Ensure the green 'Un' LED is illuminated. Verify wiring connections to the load.
  • Incorrect timing: Recheck the settings on the T1 and T2 potentiometers, including both the time range and percentage knobs. Ensure the selected function (pulse first or pause first) is correct for your application.
  • Relay failure or erratic behavior: If the relay fails prematurely or behaves erratically, ensure the connected load's current and voltage do not exceed the relay's rated capacity, especially for inductive loads. Inductive loads (e.g., motors, solenoids) can cause high inrush currents or voltage spikes that may damage the relay if not properly managed or if the relay's specifications are exceeded. Consider using an external contactor for high inductive loads.
  • No output indication: If the red 'R' LED does not illuminate when expected, check the load circuit for open connections or faults.

8. Especificacions

The following table details the technical specifications for the GEYA GRT8-S1 Asymmetric Cycle Time Relay:

Table of technical parameters for GEYA GRT8-S1 and GRT8-S2 relays, including function, supply, voltage range, burden, power input, time ranges, output, current rating, and environmental conditions

Figura 8: Paràmetres tècnics

ParàmetreValue (GRT8-S1)
FuncióAsymmetric cycler time relay
Supply TerminalsA1-A2
Voltage RangAC/DC 12-240V (50-60Hz)
CàrregaAC 0.09-3VA/DC 0.05-1.7W
Entrada de potènciamax. 6VA/1.3W
Supply IndicationLED verd
Intervals de temps0.1s-100 days (10 ranges)
Configuració de l'horaPotenciòmetre
Time Deviation10% mechanical setting
Precisió de repetició0.2% set value stability
Coeficient de temperatura0.05%/°C, at 20°C (68°F)
Sortida1 × SPDT
Valoració actual1 × 16A (AC1)
Switching Voltage250VAC/24VDC
Min. Breaking Capacity DC500 mW
Indicació de sortidaLED vermell
Vida mecànica1 × 107
Electrical Life (AC1)1 × 105
Restablir l'horamax. 200ms
Temperatura de funcionament-20 °C a +55 °C (-4 °F a 131 °F)
Temperatura d'emmagatzematge-35 °C a +75 °C (-22 °F a 158 °F)
Mounting/DIN RailDIN rail EN/IEC 60715
Grau de ProteccióIP40 per panell frontal/terminals IP20
Posició operativaQualsevol
Overvoltage CategoriaIII.
Grau de contaminació2
Max. Cable Size (mm²)Solid wire max. 1x2.5 or 2x1.5 / with sleeve max. 1x2.5 (AWG 12)

9. Garantia i Suport

GEYA products are manufactured to high-quality standards and are typically covered by a manufacturer's warranty against defects in materials and workmanship. For specific warranty terms and conditions, please refer to the documentation provided with your purchase or contact GEYA customer support.

For technical assistance, troubleshooting, or product inquiries, please visit the official GEYA store or contact their customer service department. You can find more information and contact details on the GEYA Brand Store.

Documents relacionats - GRT8-S1

Preview GEYA GRT8-S Asymmetric Cycler Time Relay Instruction Manual
Instruction manual for the GEYA GRT8-S Asymmetric Cycler Time Relay. Covers applications, function features, technical specifications, panel and wiring diagrams, and setting instructions for ventilation, lighting, and pump control.
Preview GEYA GRT8-S Asymmetric Cycler Time Relay Instruction Manual
Instruction manual for the GEYA GRT8-S asymmetric cycler time relay, detailing applications, features, technical specifications, and usage instructions for industrial and ventilation systems.
Preview Relé temporitzat multifunció GEYA GRT8-M - Manual d'instruccions
Manual d'instruccions complet per al relé temporitzador multifunció GEYA GRT8-M, que detalla les seves aplicacions, especificacions tècniques, funcions, cablejat i instal·lació.
Preview GEYA GRT8-M Multifunction Time Relay Instruction Manual
Instruction manual for the GEYA GRT8-M multifunction time relay, detailing its applications, features, technical specifications, functions, dimensions, and wiring diagrams. Provides guidance on installation and setting.
Preview GEYA GRT8 Series Digital Display Time Relay Instruction Manual
Comprehensive instruction manual for the GEYA GRT8 Series digital display time relay. Details features, 20 delay modes, technical specifications, applications in industrial automation, and operational guidance for models GRT8-X, GRT8-X1, and GRT8-X2.
Preview GEYA GRT8-A & B Single-Function Time Relay Instruction Manual
Comprehensive instruction manual for the GEYA GRT8-A & B series single-function time relays. Covers applications, features, detailed technical specifications, model connotations, panel and wiring diagrams, function timing, time setting procedures, and physical dimensions.